Inari Piotr Ciechociński

Inari Piotr Ciechociński

Call: +48 519 183 134 e-mail  This email address is being protected from spambots. You need JavaScript enabled to view it.
Error
  • JUser: :_load: Unable to load user with ID: 45
N Models

The truss bridge model (N)

Published 11 February 2013 by in N Models

The model is made of photo-etched sheets soldered together by the use of precision soldering. It is painted and ready for the assembly.

The bridge construction is based on the design study for the renovation of the Skarżysko-Kamienna - Sandomierz railway line. The bridge on the river Opatówka, 142.7 mi.

The bridge construction is based on the inventory documentation. It was included in the design study for renovation of the Skarżysko-Kamienna - Sandomierz railway line. The bridge on the river Przepaść, 125.3 mi.

The bridge construction is based on the inventory documentation. It was included in the design study for renovation of the Skarżysko-Kamienna - Sandomierz railway line. The bridge on the river Przepaść, 125.3 mi.

Page 2 of 2

Our partners:

Omak   MBR   

You are here: HOME Models Bridge Models N Models

Tel: (+48) 519183134
Email: This email address is being protected from spambots. You need JavaScript enabled to view it.

Ta strona korzysta z plików cookies w celach statystycznych oraz w celu dostosowania naszych serwisów do indywidualnych potrzeb użytkowników.Czytaj wiecej o plikach cookie i naszej polityce prywatności. Zamknij